Loss Pattern: Meter MDN-04-0847 shows a sustained six-month escalation — from 12.1% (Oct) to 36.1% (Mar) — consistent with progressive bypass interference. Technical faults typically plateau; this pattern does not.
Anomaly Flags: Consumption-to-billed ratio dropped sharply from November. Meter reads are regular, suggesting the physical unit is operational — but upstream energy is not reaching the register.
Revenue Exposure: At current trend, GHS 78,000 will be lost from this single meter over the next 12 months without intervention.
RECOMMENDED ACTION
Priority 1 — Dispatch METRIX field team to MDN-04-0847 for physical inspection. Inspect meter seals, check bypass indicators upstream of register. Coordinate with Accra East CRO for billing recovery on confirmed tamper.
RESPONSE TIME: 1.4s · NERIS CORE v1.0